# Validated Energy Concept – Dresden Wiener Straße 38–42

Energy concept consulting, simulations, and cost calculations

**Period:**:

2016 – 2017

**Client:**:

[Prime Power Systems Holding GmbH](https://pps-holding.eu/home/)

**Partners:**:

[Bau-und Ingenieur-Consulting Dresden GmbH](http://www.bic-dresden.de/)

## Energy Supply Alternatives for an Inner-City District

With environmental awareness and a holistic approach, Prime Power Systems Holding is currently creating a modern residential development in central Dresden. Seven residential buildings will provide 240 apartments and an underground parking garage with electric vehicle charging points. The site will also include a seminar building and a therapeutic health center with aquatic facilities. EA Systems Dresden GmbH’s energy architects supported PPS Holding with model-based calculations of different energy supply alternatives. The preferred option is a local heating supply with CHP and PV systems, providing an optimal balance between investment and operating costs. All information about the project was presented clearly.

 ![Energy concept for the Wiener Straße 38–42 district](/images/sites/ea-energy/pages/references-customer-opinions/energy-concept-wiener-strasse/district-energy-concept.png)

 ![View of the residential development on Wiener Straße in Dresden](/images/sites/ea-energy/pages/references-customer-opinions/energy-concept-wiener-strasse/wiener-strasse-project.jpg)

## Validated Energy Supply Concepts

- Demand and load forecasts

    - Cooling load and annual cooling energy demand
    - Heat load and annual heat demand
- Comparison of different supply concepts

    - Overall CO₂ balance comparison
    - Overall primary energy demand comparison
    - Overall comparison of energy, operating, and investment costs
- Price escalation rates and maintenance costs

## Economic Conditions

- Remuneration and levies under current legislation

    - KWK-G
    - EEG
    - StromNEV
- Operating cost prices and escalation rates

    - Electricity
    - District heating
    - Natural gas
- Maintenance costs and insurance

## Project Partners

- [Bau-und Ingenieur-Consulting Dresden GmbH](http://www.bic-dresden.de/)
